Five filling lines planned in minutes, zero manual planning

A beverage manufacturer replaced weekly manual scheduling with an automated engine that builds a plant-wide production plan in minutes and explains every decision in plain language.

−70%planning preparation time
100%of scheduling automated
0emergency Saturday shifts
Industry
Food & beverageFilling lines
Focus
SchedulingLine utilisationOn-time deliveryWaste
With Wizata
Production schedulingConstraint solverAutomationSupply chain

The challenge

A weekly plan built by hand from five to seven systems

Every week, production, planning and maintenance leads cross-referenced sales forecasts, stock levels, machine states and order books from five to seven disconnected systems, with no single source of truth.

Planning by hand created four recurring problems:

Slow, error-prone schedulingLines under capacityDowntime and scrapped SKUsEmergency Saturday shifts

What was going wrong

  1. Manual scheduling every week: slow, error-prone and impossible to scale.
  2. Filling lines idle or in the wrong sequence, wasting capacity the plant already pays for.
  3. Avoidable stoppages, and short-shelf-life SKUs overproduced and scrapped.
  4. Costly weekend shifts whenever the week's plan slipped.

Our approach

Three layers: one data model, a solver, a clear decision

Schedules are generated automatically, and every decision can be explained.

1Unify

Unified data pipeline

Stock, sales forecasts, machine states and order books from five to seven systems merge into one clean schema: a single source of truth.

2Optimise

Optimisation engine

An OR-Tools CP-SAT constraint solver sequences every order against the plant's real constraints, targeting line utilisation, on-time delivery and waste.

3Decide

Decision-ready interface

Planners see the proposed schedule, compare scenarios side by side and validate with one click. Every plan comes with a plain-language rationale.

The outcome

The plan builds itself; the lines run fuller

Planning preparation time −70%

With 100% of scheduling automated and zero manual planning effort.

01

0 emergency shifts

No more Saturday shifts to catch up on orders.

02

Higher line utilisation

Fewer idle hours across all five lines: paid-for capacity is actually used.

03

Fewer stoppages

Smart sequencing cuts avoidable downtime and the firefighting that comes with it.

04

Less waste

Short-shelf-life SKUs are produced to demand, not scrapped.

Built on the Wizata platform

Explore the platform →
Data HubStock, forecasts, machine states and orders in one schema.
AI LabThe CP-SAT scheduling engine, run as a pipeline on plant constraints.
Control PanelSchedules, scenario comparison and one-click validation for planners.

Next step

Let your plan build itself

You don't have to do it alone. Talk to one of our engineers, or spend one or two days with our team on your own data.

Your contact Martina Zanetti mza@wizata.com +34 603 791 220